**Session Date/Time:** 27 Mar 2023 04:00 # pim ## Summary The PIM working group meeting in Yokohama covered a wide range of topics related to multicast routing and address allocation. Key discussions included updates on existing drafts, presentations on new protocols like PIM-FRR based on TI-LFA and GAP, and considerations for scaling multicast deployments. The group also discussed the need to update older RFCs like 1112. ## Key Discussion Points * **PIM Election Drafts:** Progress needed on existing PIM election drafts. * **RFC Status:** Updates on several RFCs approved for publication (register packing, a-start packing, proxy YANG). * **BIZ Documents:** Discussion of moving IGMP and MLD to full Internet Standard via BIZ documents. * **PIM Light:** Presentation on PIM Light, focusing on point-to-point deployments, TCP interaction, and the need for clarity regarding multi-access considerations. * **PIM-FRR based on TI-LFA:** Presentation on a new mechanism for PIM-FRR based on TI-LFA and requests for working group last call * **Backup DR:** Presentation on backup DR election and sticky DR behavior with a discussion of interactions with another related draft. * **GAP (Group Allocation Protocol):** Presentation on a new decentralized multicast group allocation protocol with discussion of collision resolution, security, and API design. * **Zero Config Multicast Address Allocation:** Presentation on a zero-configuration approach to multicast address allocation for layer 2 networks using mDNS. * **MLD Proxy with Multi-Streaming Interfaces:** Presentation on supporting multiple interfaces in MLD proxies with different access technologies. * **RFC 1112 Update:** Discussion on updating RFC 1112 to remove IGMPv1, apply to IPv6, and incorporate ASM terminology. * **Scaling Multi-Cast using Tunnels:** Presentation around how to scale the different dimensions that exist when considering multi-cast networks ## Decisions and Action Items * **P2P Policy PING:** Resend a new email requesting early allocation for P2P Policy PING to the ADs and Mp chairs, copying the original request. * **PIM Light:** Update the PIM Light draft based on feedback received, clarifying its applicability to point-to-point deployments and addressing multi-access concerns. * **PIM-FRR based on TI-LFA:** Take the PIM-FRR draft to the mailing list to determine if there is any outstanding feedback before beginning working group last call. * **Backup DR:** Analyze the interplay between the sticky DR approach and another draft, and discuss which one works best. * **GAP (Group Allocation Protocol):** Need to better explain to other members how to resolve collision * **RFC 1112 Update:** Tore to discuss updates with Jim (the AD) regarding process. ## Next Steps * Discussions on various topics will continue on the mailing list. * Adoption calls for several drafts will be initiated on the mailing list. * Further testing and development of GAP will be conducted. * Further development and analysis for the Backup DR case will be done