Markdown Version | Session Recording
Session Date/Time: 27 Mar 2023 04:00
pim
Summary
The PIM working group meeting in Yokohama covered a wide range of topics related to multicast routing and address allocation. Key discussions included updates on existing drafts, presentations on new protocols like PIM-FRR based on TI-LFA and GAP, and considerations for scaling multicast deployments. The group also discussed the need to update older RFCs like 1112.
Key Discussion Points
- PIM Election Drafts: Progress needed on existing PIM election drafts.
- RFC Status: Updates on several RFCs approved for publication (register packing, a-start packing, proxy YANG).
- BIZ Documents: Discussion of moving IGMP and MLD to full Internet Standard via BIZ documents.
- PIM Light: Presentation on PIM Light, focusing on point-to-point deployments, TCP interaction, and the need for clarity regarding multi-access considerations.
- PIM-FRR based on TI-LFA: Presentation on a new mechanism for PIM-FRR based on TI-LFA and requests for working group last call
- Backup DR: Presentation on backup DR election and sticky DR behavior with a discussion of interactions with another related draft.
- GAP (Group Allocation Protocol): Presentation on a new decentralized multicast group allocation protocol with discussion of collision resolution, security, and API design.
- Zero Config Multicast Address Allocation: Presentation on a zero-configuration approach to multicast address allocation for layer 2 networks using mDNS.
- MLD Proxy with Multi-Streaming Interfaces: Presentation on supporting multiple interfaces in MLD proxies with different access technologies.
- RFC 1112 Update: Discussion on updating RFC 1112 to remove IGMPv1, apply to IPv6, and incorporate ASM terminology.
- Scaling Multi-Cast using Tunnels: Presentation around how to scale the different dimensions that exist when considering multi-cast networks
Decisions and Action Items
- P2P Policy PING: Resend a new email requesting early allocation for P2P Policy PING to the ADs and Mp chairs, copying the original request.
- PIM Light: Update the PIM Light draft based on feedback received, clarifying its applicability to point-to-point deployments and addressing multi-access concerns.
- PIM-FRR based on TI-LFA: Take the PIM-FRR draft to the mailing list to determine if there is any outstanding feedback before beginning working group last call.
- Backup DR: Analyze the interplay between the sticky DR approach and another draft, and discuss which one works best.
- GAP (Group Allocation Protocol): Need to better explain to other members how to resolve collision
- RFC 1112 Update: Tore to discuss updates with Jim (the AD) regarding process.
Next Steps
- Discussions on various topics will continue on the mailing list.
- Adoption calls for several drafts will be initiated on the mailing list.
- Further testing and development of GAP will be conducted.
- Further development and analysis for the Backup DR case will be done